Enabler & Initiative Tracker 1 / 8 Esc · Exit
SLIDE 1 OF 8 · COVER + DECK CONTENTS
EVERDRIVEN · ENABLER & INITIATIVE TRACKER

Enabler & Initiative Tracker

EverDriven · Tech Transformation · Apr → Aug 2026 — Engine + BC Slices view
15
Tier 0 Arch Capabilities
Persistent platform · Architecture-owned
2
Tier 1 Cross-Cutting Enablers
RBAC · Data Sync · 11 Engine + BC Slices
3
Tier 2 Domain Enablers
VR/PT · ST Lifecycle · DMV 2.0
7
Initiatives unblocked Apr–Aug
EverWatch · DrivePath · ParentLink · FlexFare · EasyStart · NDP · (Valkyrie hold)
How to read this
Stakeholders should ask about the slice, not the whole enabler. RBAC and Data Sync each have an Engine epic plus one slice per consuming Bounded Context (Trip Operations, Enrollment/Demand, Mobile, etc.). The unblock event for an initiative is the BC slice landing — never "RBAC complete." This deck mirrors that structure: each slide drills into one tier of the cascade.
Deck contents
01Cover + Deck Contents
02RBAC — Engine + 5 BC Slices
03Data Sync — Engine + 4 BC Slices
04Tier 2 Domain Enablers (VR/PT · ST Lifecycle · DMV 2.0)
05Business Milestone Cascade — Tier 0 → Initiatives
06Initiative → Enabler Dependency Map
07What's Running in Parallel — Apr → Aug
08Risk Lens — If This Slips, This Stops
Tier 0 capability detail (15 cards across 4 bands) lives in its own deck — bmb slides build tier0-overview.
SLIDE 2 OF 8 · RBAC ENGINE + BC SLICES
EVERDRIVEN · TIER 1 · RBAC — ENGINE + BOUNDED CONTEXT SLICES

Per the Apr 27 restructure, RBAC is no longer tracked as one monolith.

Engine + 5 BC slices · the unblock event for an initiative is the slice landing — never the whole enabler.
Piece
What it delivers
Progress · target
Initiatives it unlocks
RBAC Engine
TIER 1 ARC
FusionAuth identity provider · jwt-zAuth token plumbing · Policy Engine · Tenant Isolation.
D1–D10 design Apr 30
FusionAuth + Traefik May 17
Hardening May 25
Engine GA May 31
25d to target
Foundation for the slices below — does not directly unblock any initiative on its own.
RBAC: Trip Operations
P0 TRIP
Driver auth + SignalR + service tokens. Stabilises existing TripHQ before extending to external trip tracking.
Auth surface design May 7
SignalR integration May 24
Service token rollout May 31
TripHQ unblock Jun 7
32d to target
  • EverWatch — TripHQ stabilisation
  • Prerequisite for District & VIP App slices
RBAC: EverWatch District
TRIP
External trip tracking auth — district-side identities and tokens.
District design May 28
Identity bridge Jun 15
Token rotation Jun 25
District unblock Jul 1
56d to target
  • EverWatch — District Beta (Aug)
RBAC: EverWatch VIP App
MOB
VIP App auth integration — mobile session handling.
VIP App auth design Jun 8
Mobile session bring-up Jul 1
VIP App unblock Jul 22
77d to target
  • EverWatch — VIP App Beta (Aug)
RBAC: Enrollment / Demand
GA blocker ENR / DEM
Enrollment service auth — gate for any go-live in the Enrollment / Demand domains.
ENR auth design Jun 16
Service auth Jul 15
ENR unblock Aug 5
91d to target
  • EasyStart go-live
  • FlexFare go-live (Sep build)
RBAC: Mobile / ParentLink
MOB
ParentLink auth integration — caregiver-side mobile sessions.
Mobile auth design Jul 1
ParentLink integration Aug 1
Mobile unblock Aug 15
101d to target
  • ParentLink long-term stability
SLIDE 3 OF 8 · DATA SYNCHRONISATION ENGINE + BC SLICES
EVERDRIVEN · TIER 1 · DATA SYNCHRONISATION — ENGINE + BOUNDED CONTEXT SLICES

Same Engine + Slice pattern as RBAC. Engine = Strangler Fig + ACL + Dual-Write Coordinator + Circuit Breaker.

Engine + 4 BC slices · the unblock event for an initiative is the slice landing — never the whole enabler.
Piece
What it delivers
Progress · target
Initiatives it unlocks
Data Sync Engine
TIER 1 ARC
Strangler Fig pattern + Anti-Corruption Layer + Dual-Write Coordinator + Circuit Breaker. Replaces brittle PHIL v1 jobs with an event-driven foundation.
ACL + Strangler design Apr 15
Dual-write coordinator Apr 28
Circuit breaker May 4
Engine GA May 8
2d to target
Foundation for the slices below — does not directly unblock any initiative on its own.
Data Sync: TRF Intake API
Shadow active ENR
Trip-request intake flow — shadow mode running today, scheduled cutover to bi-directional.
Shadow mode active Apr 22
Shadow validation May 24
Cutover Jun 15
40d to target
  • EasyStart launch
Data Sync: Student / CEP Sync
Shadow active ENR
Student + Customer Engagement Platform sync — shadow mode → cutover.
Shadow mode active Apr 22
Shadow validation May 24
Cutover Jun 15
40d to target
  • EasyStart launch
  • EverWatch District Beta
Data Sync: GPS & ETA
Planned TRIP
Driver location + ETA stream sync — net-new build, bi-directional from day one. ★ Highest-leverage slice.
Build start Jun 1
Bi-directional bring-up Jul 1
Cutover Jul 30
85d to target
  • EverWatch District Beta
  • DrivePath cutover
Data Sync: VR/PT Lifecycle
Planned TRIP
Variable Route / Pickup-Tracking lifecycle events — bi-directional sync with downstream systems.
Build start Jun 1
Bi-directional bring-up Jul 1
Cutover Jul 30
85d to target
  • DMV 2.0 PH.1 → DrivePath
SLIDE 4 OF 8 · TIER 2 DOMAIN ENABLERS
EVERDRIVEN · TIER 2 · DOMAIN ENABLERS

Bounded-Context-scoped enablers · 3 in-flight

Bounded-Context-scoped enablers · 3 in-flight · domain-specific capabilities that one or two initiatives consume — they don't fan out across the whole platform like Tier 1.

VR/PT Lifecycle

Trip Operations
PH.1 — Variable Route / Pickup-Tracking lifecycle model rolled out to Trip Ops. PH.2 (Q4) extends to MatchMaker + Door-to-Door.
Jul 1 — PH.1 56d to target
PH.2 → Q4 '26
Unlocks
  • PH.1 → DrivePath
  • PH.2 → MatchMaker + PathFinder

ST Lifecycle

Enrollment
Student-transport lifecycle: onboarding, scheduling, exits. Backend dev complete first half of Q2; transformation to GA mid-quarter.
Jun 30 — GA 55d to target
Unlocks
  • EasyStart launch

DMV 2.0

Compliance / Supply
Driver Management v2 — PH.1 covers DrivePath cutover scope; PH.2 covers Door-to-Door + MatchMaker scope.
Jul 1 — PH.1 56d to target
PH.2 → Q4 '26
Unlocks
  • PH.1 → DrivePath
  • PH.2 → MatchMaker + Door-to-Door
SLIDE 5 OF 8 · BUSINESS MILESTONE CASCADE
EVERDRIVEN · CASCADE · BUSINESS MILESTONE → INITIATIVES → ENABLERS → TIER 0

What every business milestone actually consumes

Read left → right: each row traces the full dependency chain from commitment back to platform foundation
Trip Tracking — 100% Operations & Sales
Jun 15, 2026
Initiatives
EverWatch · Trip Operations
Tier 1 Enablers
RBAC Foundation Live Data Sync · GPS & ETA slice
Tier 0 Prerequisites
Data & Multi-Tenancy Auth / RBAC Runtime Observability & Telemetry Messaging Backbone Outbox & Reconciliation Resilience Health Checks
Launch Compliance 2.0 — Select SPs
Jul 1, 2026
Initiatives
DrivePath DMV 2.0 PH.1
Tier 1 Enablers
VR/PT Lifecycle (Trip Ops + Rescue) Data Sync slice (post-RBAC)
Tier 0 Prerequisites
Data & Multi-Tenancy Auth / RBAC Runtime PII Protection Workflow Orchestration (Conductor) Case Management Platform Outbox & Reconciliation Messaging Backbone Feature Flags Domain & Application Building Blocks
Launch Beta — District Onboarding
Jul 30, 2026
Initiatives
EasyStart
Tier 1 Enablers
RBAC Foundation Live ST Lifecycle (Subscription Trip Data) Data Sync · Student-CEP + TRF
Tier 0 Prerequisites
Data & Multi-Tenancy Auth / RBAC Runtime PII Protection Workflow Orchestration (Conductor) Outbox & Reconciliation Messaging Backbone Domain & Application Building Blocks Observability & Telemetry
Trip Tracking — 100% Districts + VIP App
Aug 30, 2026
Initiatives
EverWatch (District + VIP) ParentLink (VIP App)
Tier 1 Enablers
RBAC EverWatch District + VIP slices Data Sync · GPS & ETA continuation
Tier 0 Prerequisites
Data & Multi-Tenancy Auth / RBAC Runtime Observability & Telemetry Messaging Backbone Outbox & Reconciliation Caching & Read Models Resilience Health Checks
Replace District Portal
Aug 30, 2026
Initiatives
EverWatch EasyStart Self-Service Reporting
Tier 1 Enablers
RBAC Enrollment-Demand slice Data Sync · Student-CEP slice
Tier 0 Prerequisites
Data & Multi-Tenancy Auth / RBAC Runtime PII Protection Messaging Backbone Outbox & Reconciliation Domain & Application Building Blocks Caching & Read Models Observability & Telemetry
SLIDE 6 OF 8 · INITIATIVE → ENABLER DEPENDENCY MAP
EVERDRIVEN · INITIATIVE → ENABLER DEPENDENCY MAP

Who is blocked by what · 12 initiatives

Use slice names, not enabler names. Refresh at every Portfolio Review. HIGH = customer-facing commit · MED = supporting · HOLD = not in-flight.
EverWatch — District Beta
HIGH Aug 2026 launch 101d to target
0 of 4 unblocked
  • RBAC: Trip Operations
  • RBAC: EverWatch District
  • Data Sync: GPS & ETA
  • Data Sync: Student / CEP Sync
EverWatch — VIP App Beta
HIGH Aug 2026 launch 108d to target
0 of 1 unblocked
  • RBAC: EverWatch VIP App
EverWatch — 100% Internal
MED May 2026 24d to target
0 of 1 unblocked
  • Tier 0: Feature Flags (Watch)
EasyStart
HIGH Aug 2026 unblock 101d to target
0 of 4 unblocked
  • ST Lifecycle GA
  • Data Sync: TRF Intake API
  • Data Sync: Student / CEP Sync
  • RBAC: Enrollment / Demand
DrivePath
HIGH Jul 2026 cutover 70d to target
0 of 3 unblocked
  • DMV 2.0 PH.1
  • Data Sync: GPS & ETA
  • VR/PT Lifecycle PH.1
FlexFare
HIGH Sep 2026 build start 118d to target
0 of 1 unblocked
  • RBAC: Enrollment / Demand
ParentLink
MED In flight (3.1.x)
1 of 2 unblocked
  • RBAC: Mobile / ParentLink
  • EverPulse integration
MatchMaker + PathFinder
MED Nov 2026 unblock 193d to target
0 of 2 unblocked
  • DMV 2.0 PH.2
  • VR/PT Lifecycle PH.2
EverPulse
MED May/Jun M1+M2 40d to target
1 of 2 unblocked
  • Tier 0: Feature Flags
  • Tier 0: Health Checks
Chronicle
LOW Jun 2026 PRD 55d to target
0 of 1 unblocked
  • FlexFare / Pricing platform
Valkyrie
HOLD Resume criteria TBD
0 of 1 unblocked
  • TripHQ + RBAC (resume criteria TBD)
New Data Platform
AT RISK Apr 30 Rhapsody → Bronze 6d overdue
0 of 3 unblocked
  • Salesforce ingest (RevOps sign-off)
  • CC historical ingest (business unblock)
  • Netsuite + DevOps bandwidth
SLIDE 7 OF 8 · WHAT'S RUNNING IN PARALLEL
EVERDRIVEN · WHAT'S RUNNING IN PARALLEL · APR → AUG 2026

Initiatives in active development alongside the enabler build

What each delivers without waiting for the cross-cutting enablers to land. 7 initiatives in active development.
Initiative
Status
Active milestones (Apr–May)
Waiting on
EverWatch (Trip Operations)
At Risk
Apr 14 — SMT Leadership Rollout Review · Apr 15 — Alpha build with backgrounding fix · Apr 2 — TripHQ improvements released ✓
Gate: RBAC: Trip Ops + RBAC: District (external trip tracking)
DrivePath (Compliance)
At Risk
Apr 1 — CC2.0 live in production ✓ · CC data export verification pending · CC contract extension under legal review
Gate: DMV 2.0 PH.1 + Data Sync (GPS&ETA, VR/PT)
ParentLink
At Risk
Apr 7 — TCB deployed (partial rollback) · Apr 10 — redeploy · Apr 14 — Combined VIP release rollout begins
Gate: RBAC: Mobile / ParentLink + EverPulse
FlexFare
On Track
Apr 8 — MojoTrek on-site ✓ · Apr 23 — Rate card parity validation · Late Apr / early May — PRD Review
Gate: RBAC: Enrollment / Demand (Sep build start)
EasyStart
On Track
Early May — PRD Review · May 12 — Core services deployed · May 12 — TR Creation milestone
Gate: ST Lifecycle GA · Data Sync (TRF + CEP) · RBAC ENR/DEM
New Data Platform
At Risk
Apr 15 — Quota / FY Quarterly Dimension (delayed) · Apr 30 — Rhapsody → Bronze
Gate: RevOps sign-off (Salesforce) + business unblock (CC historical) + Netsuite + DevOps bandwidth
Valkyrie
On Hold
Resume criteria being documented
Gate: Foundational platform work + RBAC + TripHQ
SLIDE 8 OF 8 · RISK LENS
EVERDRIVEN · RISK LENS · IF THIS SLIPS, THIS STOPS

The 4 highest-leverage slip scenarios in the Apr → Aug window

Each callout names the milestone, what slips with it, and the downstream blast radius.
!
RBAC Engine slip (target May 31)
All five BC slices wait on Engine GA. A 2-week slip pushes RBAC: Enrollment to mid-Aug, which moves EasyStart go-live and FlexFare Sep build right with it.
!
Data Sync GPS & ETA slip (target Jul 30)
Single slice unblocks two HIGH initiatives — EverWatch District Beta and DrivePath cutover. This is the highest-leverage slice in the whole tracker.
!
ST Lifecycle GA slip (target Jun 30)
EasyStart can't launch without ST Lifecycle and TRF Intake + CEP Sync cutover. All three need to land for the Aug unblock.
!
Tier 0 Feature Flags watch
Compliance 2.0 cutover stressed the LaunchDarkly fallback path. EverWatch internal-100%, EasyStart, and FlexFare all gate on Feature Flags being healthy — keep this surfaced in Portfolio Review until status returns to Healthy.